神马秋霞午夜鲁丝片,香蕉网柠檬tv,草草浮力发地布地扯

伊人久久中午字幕 美女露全身不用手遮挡 手机看1024旧版免费 45分钟规视频在线观看 小优视频app下载为爱而生香蕉 男女动态试看视频30分钟 红杏视频安装 把小媳妇乳罩解升了 人人做人人千 茄子视频为爱而生安卓下载 se老板最新线路一 桥本有菜香蕉app 草莓app成年色版下载 草草最新发地布地扯页 日本污直播软件下载ios 成人版快手 午间视频直播未成年禁入 男生捅女生软件大全 多鱼网15页 avcao 18岁勿看的1000视频 白妇传全文阅读无删节 午夜影院普通用户夜 草草影视浮力路线 花间直播app十七以下禁 骚虎视频国产 非会员只能试看30秒 亲嘴视频的软件app 多鱼网电影日本 视频试看一分钟体验区 亚洲无线码不卡 夜秀场第4场入口 182ta午夜特别网 蝴蝶直播app软件官网 攻往受里面塞生姜 香蕉导航网站 白妇全文无删节txt下载 迷妹导航番茄 香蕉视频色版 恋夜视频安卓uc浏览器 视频免费观看20秒 骚虎黄区 caoprom国产免费视频 时间静止催眠怀表2 樱桃网 快穿美人难忘h繁体 14破virginhd俄罗斯 岛国搬运 3344kk在线播放 春意影院非会员试看专区 


Test Environments

We offer tailored test environments of varying complexity for your stack module. The basic test environment uses a gas mixture of some hydrogen in nitrogen, which is available on request and brought up to operating temperature using electric heaters. SOFC stack operation can also be tested using hydrocarbons. This may involve the creation of synthetic reformate mixtures or the integration of reforming reactors into the test environment. The two primary reforming techniques (auto thermal reforming (ATR) and steam reforming (SR)) can both be used to stacks or degradation rates during the use of system-relevant fuels.

All test equipments are supplied with electric preheaters, gas and water dosing units, power circuitry and cables, the system which is equipped a 10 inch, 26 million color TFT touch screen MMI with Man-Machine Interface (MMI) and a multi-level safety system. Heat exchangers (for waste heat recovery) and waste gas burners can be integrated on request. A desulphurizer is connected in series before the stack if sulphurous gases (natural gas, biogas) are to be used.

The following test options are available:

Gas mixtures:

– Hydrogen-nitrogen mixture

– Electric gas preheater or gas-to-gas preheater

Synthetic mixture:

– Gas infeed (CO, CO2, H2, N2)

– Gas humidification

– Electric gas preheater or gas-to-gas preheater

ATR reforming:

– Air and CH4 or natural gas infeed

– ATR reformer and evaporation

– Electric gas preheater or gas-to-gas preheater

Steam reforming:

– CH4 or natural gas infeed

– Water infeed and evaporation

– Steam reformer with adjustable reforming rate

– Electric fuel gas preheater and air preheater

FEATURE:

– Available test environments on request for your stack module

– Technology based on many years of our test experience

– One-stop system supply

TECHNICAL:

(1). Performance classes: 0.5-1 kW, 1-3 kW, 2-5 kW (tailored to power performance of stack module)

(2). Operating gases: Natural gas, biogas (synthetic where required), methane, others available on request

Price:

Customized according to requirements.

Contact:
Dr. Peng Jun, Sales Representative, Email:jpeng@sofcman.com, Phone:+86-574-86685097, Mobile:+86-13567906171
Dr. Wang Weiguo, Director, Email:wgwang@sofcman.com, Phone:+86-574-87911363, Mobile:+86-13867802227